Reliability HotWire: eMagazine for the Reliability Professional
Reliability HotWire

Issue 9, November 2001

Hot Topics

Determining the Connection Between Test and Field Reliability

[Editor's Note: This article has been updated since its original publication to reflect a more recent version of the software interface.]

One of the most difficult activities for a reliability engineer is making a quantifiable connection between reliability results from in-house testing and the reliability experienced by items in the field. Often, tests will be performed on products in development in order to make an estimate of the reliability in the field. The results of these tests, however, may not match the actual field performance once the product has been released. In this article, we look at a way of using the proportional hazards model to help quantify an acceleration factor that can link lab and field reliability performance.

The proportional hazards model is a life-stress relation used in accelerated testing analysis. One of the advantages of this model is its allowance for indicator variables. Indicator variables are discrete variables, as opposed to continuous variables that may be used to represent temperature, relative humidity, etc. Indicator variables are categorical variables that indicate a discrete state, such as the manufacturing lot from which a sample is drawn. Indicator variables only take on a value of 0 or 1. In this example, the indicator variable will be used to denote whether a data point is from a laboratory test or from the field.

To illustrate the process, we have a data set from an in-house test that is supposed to reflect the stresses that the product would see in the field. Based on surveys of customer usage, the test is designed to have the same types of stresses that the product will see in the field. The test is generally regarded to be accelerated in that failures on the test occur more quickly than they do in the field. However, the acceleration factor is unknown and attempts to extrapolate field reliability estimates from the results of the test have been haphazard at best.

We assume that the lab and the field exert different stresses on the product, resulting in different failure times. However, we should also like to be fairly certain that the same failure modes are being exercised as well. Obviously, this could be determined by a failure analysis of all of the failed units. This is not practical in all cases, however, particularly for field failures. Fortunately, there are ways of determining that the assumption of similar failure modes is valid, based on the results of the analysis.

In order to determine the acceleration factor between the test and the field, test data and field data from the same model of the product must be compared. For test data, we have the results of a test on which ten units were run until failure. The failure times are at 50, 92, 97, 98, 102, 110, 122, 70, 144, and 47 hours. For field information, 20 units were selected at random and monitored for field performance. During the course of the monitoring period, failures were encountered at 18, 8, 10, 11, 13, 14, 16, 17, and 18 months. Also, 11 other units performed for 19 months with no failures. Note that the time units differ between the in-house test and the field data; the test data set is in hours and the field data set is in months. Rather than try to convert one set of data to the other's time units, we will deal with this discrepancy after the data have been analyzed.

The data will be entered in ReliaSoft's ALTA PRO software, with the environment (lab vs. field) for the stress factor. This will be an indicator variable, with 0 denoting field use and 1 denoting lab testing. The following graphic shows the data in ALTA PRO:

Lab and Field Data Entered in ALTA PRO

With the data entered, the analysis can now be performed using the proportional hazards model. Once the data set has been analyzed, we should check to make sure that assumptions regarding the nature of the relationship between test lab and field use are valid. Basically, if the same failure modes are being attained at different stress levels, the slope of the Weibull probability plot should be the same at the different stresses. This is shown in the following graphic:

Lab vs. Field Probability Plot

As the plot indicates, the data points for both environments conform closely to the calculated beta value of 3.53. Another way of checking this assumption is to compare contour plots for the two environments. This can be done by analyzing the data sets separately in the Weibull++ software, and creating a multiple contour plot.

Contour Plot from Weibull++ 6

The contour plot indicates that the values of eta vary between the two environments, but the beta values fall within the same range. This further supports the assumption that the units are undergoing the same failure modes in both the lab and the field.

With the assumptions supported by the data analysis, we can use ALTA's QCP to calculate the acceleration factor. The results are shown in the next figure:

Acceleration Factor Results in ALTA's QCP

This indicates that the acceleration factor from stress level 0 (field data) to stress level 1 (lab data) is 4.7. In other words, the units in the field fail 4.7 times faster than the units in the test lab.

While this result initially seems counterintuitive, recall that the time units for the two data sets are different: the lab test times were in hours, while the field data points were in months. Keeping this in mind, we can say that 4.7 hours of time for this particular test is equivalent to one month in the field. We have now quantified the acceleration factor1 between the lab testing and the field, and this information can be used in subsequent reliability calculations.

For example, we can use Weibull++ to analyze just the lab data given in the previous example in order to determine the time at which five percent (5%) of the units in the field would fail.

B(5) Life Results for Lab Units in the Weibull++ QCP

This shows that five percent of the units in the lab will have failed at 46.16 hours. Since we know that 4.7 hours of lab test time is equivalent to one month of field use, we can say that five percent of the units in the field will have failed at 9.82 months (46.16/4.7 = 9.82).

 

1In this case, one can consider this to be a conversion factor as well, since the field units are in months and the lab units are in hours.

ReliaSoft Corporation

Copyright © 2001-2014 ReliaSoft Corporation, ALL RIGHTS RESERVED