Least squares confidence bounds can be computed for both the model parameters and metrics of interest for the Duane model.
This section of the on-line reference includes the following subsections:
Apply least squares analysis on the Duane model:
The unbiased estimator of can be obtained from:
where:
Thus, the confidence bounds on and b are:
(19)
(20)
where denotes the percentage point of the t distribution with n - 2 degrees of freedom such that and:
(21)
(22)
(23)
Confidence bounds can also be obtained on the cumulative MTBF and the cumulative failure intensity:
(24)
(25)
(26)
When n is large, the approximate confidence bounds for instantaneous MTBF are given by:
(27)
(28)
and ; therefore, the confidence bounds on the instantaneous failure intensity are:
(29)
(30)
For the data given in Table 4.3, calculate the 90% confidence bounds for:
The parameters and b.
The cumulative and instantaneous failure intensity.
The cumulative and instantaneous MTBF.
Using the values of and estimated from the least squares analysis in Example 3:
Eqn. 23 is:
Eqn. 21 is:
Eqn. 22 is:
Thus, 90% confidence bounds on parameter using Eqn. 19 are:
And 90% confidence bounds on parameter b using Eqn. 20 are:
2. The cumulative failure intensity is:
And the instantaneous failure intensity is equal to:
So, at the 90% confidence level and for T = 22,000 hr, the confidence bounds on cumulative failure intensity are:
For the instantaneous failure intensity:
Figures 4.7 and 4.8 show the graphs of the cumulative and instantaneous failure intensity. Both are plotted with confidence bounds.
Figure 4.7: Cumulative Failure Intensity plot with 2-sided 90% confidence bounds
Figure 4.8: Instantaneous Failure Intensity plot with 2-sided 90% confidence bounds
3. The cumulative MTBF is:
And the instantaneous MTBF is:
So, at 90% confidence level and for T = 22,000 hr, the confidence bounds on the cumulative MTBF are:
The confidence bounds for the instantaneous MTBF are:
Figure 4.9 displays the cumulative MTBF while Figure 4.10 displays the instantaneous MTBF. Both are plotted with confidence bounds.
Figure 4.9: Cumulative MTBF plot with 2-sided 90% confidence bounds
Figure 4.10: Instantaneous MTBF plot with 2-sided 90% confidence bounds